Rural Distributor Road, Lithgow NSW

PROJECT

Raised Boardwalk, Kangaroo Point NSW

Oct 28, 2024

Green Civil Services engaged to Design & Construct of a 500m Boardwalk & 14m Pedestrain Bridge

Design & Certification

  • Preparation, Implementation and Management of Project specific strategies and management plans.
  • Design through Concept to 50% to 80% to IFC Drawings
  • Fisheries Permits and Construction Certificate
  • PCA Engagement and Certification, Civil and Structural Certification

Demolition and Clearing

  • Removal of existing tree as identified in the Approve Plans in an environmentally friendly manner.
  • Removal of existing contaminated material & safe disposal of waste to a licenced waste management facility.
  • Trimming and protection of mangroves to clear path for boardwalk with Ecologist

Construction

  • Supply and Install 555 lm of 3m width FRP elevated boardwalk suspended on FRP Driven Piles and handrails/kickboards inclusive of viewing platforms meandering from Kangaroo Point south through the mangroves and intertidal waterways.
  • 14m FRP Bridge on Piles and Concrete Abutments with Handrails, Balustrade and Kickboards over Seymour’s Creek waterway.
  • Viewing Platforms with public seating