Raised Boardwalk, Kangaroo Point NSW
Oct 28, 2024
Green Civil Services engaged to Design & Construct of a 500m Boardwalk & 14m Pedestrain Bridge
Design & Certification
- Preparation, Implementation and Management of Project specific strategies and management plans.
- Design through Concept to 50% to 80% to IFC Drawings
- Fisheries Permits and Construction Certificate
- PCA Engagement and Certification, Civil and Structural Certification
Demolition and Clearing
- Removal of existing tree as identified in the Approve Plans in an environmentally friendly manner.
- Removal of existing contaminated material & safe disposal of waste to a licenced waste management facility.
- Trimming and protection of mangroves to clear path for boardwalk with Ecologist
Construction
- Supply and Install 555 lm of 3m width FRP elevated boardwalk suspended on FRP Driven Piles and handrails/kickboards inclusive of viewing platforms meandering from Kangaroo Point south through the mangroves and intertidal waterways.
- 14m FRP Bridge on Piles and Concrete Abutments with Handrails, Balustrade and Kickboards over Seymour’s Creek waterway.
- Viewing Platforms with public seating